CO2 Gas Protection System: Duncanrig School
15/06/2022
Client: Amec Construction
Location: East Kilbride, Scotland
Contract Size:
9,500m² 1.0mm Landflex HCR and approx 300 LM adhesive gas sealing membrane
Purpose: Gas barrier to provide Methane and CO2 Gas protection
Contract Period: 22 Days
Read more about our Gas Protection Systems HERE