Firewater Pond Lining: Pembrokeshire
15/06/2022
Employer: AW Austel Ltd
Engineer: Whessoe-Volker Stevin
Location: Milford Haven, Pembrokeshire
Contract Size:
5,200m² 1.5mm Landflex PE150HD with Landflex G3000 protective geotextile
Purpose: Firewater pond lining for an oil terminal site
Contract Period: 1 Week
Read more about our Fire Water Pond lining services HERE
Search for
Recent Blogs
Categories
- Attenuation linings(4)
- Case Study(3)
- Drinking Water(9)
- EPS Block Wrapping (Encapsulated Polystyrene Blocks)(2)
- Gas Barrier & Gas Venting(12)
- Landfill & Environment(7)
- Petrochemical Containment(6)
- Reed Beds(3)
- Reservoirs, Lakes & Canals(12)
Archives
- November 2022 (1)
- June 2022 (52)
- August 2016 (2)
- April 2015 (1)
- March 2015 (1)